These buildings were developed to attract life sciences companies. The HVAC and plumbing systems needed to accommodate various office/lab floor plan layouts. Working closely with the owner and the design team, we provided a design that allowed for maximum flexibility to allow for life sciences companies with a biology focus or doing heavy chemistry research. This approach allowed the owner to lease the buildings to multiple tenants before the buildings were completed.

[Project Facts](https://www.therma.com/portfolio/bcop-phase-1-2/#project-facts)

- **Project Name:** BCOP Phase 1 & 2 (Warm Shell)
- **Contractor:** Hathaway Dinwiddie
- **Sq. Footage:** 500,000 ft2
- **Cost:** $25 Million
- **Scope of Work:** Design-build the HVAC and plumbing systems for Phase 1 & 2 of the BCOP campus in South San Francisco, including four lab/office buildings and one 9-story parking structure with 2,057 stalls.

### [Santa Clara University Sobrato Campus for Discovery & Innovation](https://www.therma.com/portfolio/santa-clara-university-stem/)

### [5300 Central Parkway](https://www.therma.com/portfolio/5300-central-parkway/)

### [Sheet Metal Workers Local No. 104 Union Hall](https://www.therma.com/portfolio/sheet-metal-union-hall/)

### [Stanford Graduate School of Business](https://www.therma.com/portfolio/stanford-graduate-school-of-business/)

### [Taylor Farms](https://www.therma.com/portfolio/taylor-farms/)