THERMA PRE-TASK HAZARD PLAN

THERMA PRE-TASK HAZARD PLAN

Project/Equipment/System Description: Date: Time:
Foreman: Phone: Company:
Building: Floor:0 Area: Job#:
Work Description:
Task Specific Work Plans Hazards Safe Plan of Action (SPA)
Energized Electrical WorkHot work(nonelectrical)Building on test(smoke/sprinkler)Confined spaceCritical lift(cranexcavation) Slips, Trips,Falls Inspect for trip/slip hazardsArea clean/clear of debrisHazards markedTools & material properly storedElectrical/emergency equipment clear
Floor/wall penetrationsLock-out/Tag-out proceduresLine breakingEquipment demo work plans Hand:Cut/Bump Hazards Inspected work area for sharp edgesFound sharp edges and protectedInspected walking pathsIdentified edges and marked as such
Required PPEHard hatSafety glassesFace shieldGogglesGloves:LeatherAcidSolventKevlar/cut resistantArm sleevesFoot Protection:BootsSteel-toeToe coversEar plugs/ear muffsSafety vestChemical-resistant suit/apronRespirator Interruptions to Production Area inspected to identify EMO's(electrical connections, valves, pipes,tubing,fittings,gauges,fire sprinklers smoke detection,liquid leak detection,AMHS equipment)Protected,guarded or marked
Additional PPE(see comments) Hand& Power Tools Reviewed safety requirementsInspected conditionGuarding OKGFCI in useIdentified PPE requiredInspected electrical cordRouted cord overhead or taped/barricated
Chemical Hazards Area inspected for potential chemical hazardMSDS availableIdentify PPE for highest recognized hazard(see left side)Reviewed decontamination/disposal or storage proceduresReviewed contingency plan and equipment is on hand
Hazardous Energies Lock-out/tag-out/verifyConfirm that equipment is de-energized1lock/lkey1personDouble block & bleedMechanical,electrical,chemical,thermal,stored,radiation
Non-electrical Hot Work Fire extinguishersFire watchInstall weld/stormscreensCombustible material removed/protectedAdequate ventilation
ExcavationUSA Ticket #—— Reviewed as-builts/locatesBarricades providedProper sloping/shoringAccess/egress providedExcavation inspected by competent personHand dig areas are clearly marked(within 3 feet of utilities)
Fall Protection Scaffolds Competent person inspects dailyCondition tags in placeProperly secured/wheel locksToe boards usedFootings adequate
Ladder inspection completedRetractable device requiredInspected fall protection equipmentShock absorbing lanyard requiredHorizontal lifeline system requiredAnchorage point identifiedFall clearance distance adequateFall rescue/retrieval plan set up Vehicular Traffic Traffic barricadesConesFlagmenLane closureFire lane is clear
Crane or other Lifting Equipment Lifting/rigging equipment inspectedTag lines in useAreas barricadedOverhead utility clearance verifiedSignalman assigned
Barricades Yellow barricade tapeRed barricade tapeRigid barricade required/securced to floorBarricade signageEmergency egress pathways clearly markedTravel paths barricaded/cones to protect foot traffic
Environmental Storm water protectedHazardous waste planGround protected from metal shavingsDumpsters coveredDust controls in place
Weather Review plans for weather including heat/wind/moistureLiquids availableCool-down periodsSun-screenHeat stress symptoms
Crew Congestion / Impact to Occupants Inspected areas for potential impacts to other crews/customersCoordinated with adjacent work supervisor/customer

Additional safe plans for hazards

Major Steps of Task Tools Required to do Job Safely Recognized Hazard categories and additional hazards not captured on front page. Additional safe plans for hazards
Eyewash/Shower Location: Fire Extinguisher Location:
Phone Location:

Recognized Hazard categories and additional hazards not captured on front

Did conditions change? STOP the job! Identify control measures. Update the PTP. Communicate!

Tools Required to do Job Instructions: 1) Conduct a walk-through of work area, inspecting for hazards. 2) Write the steps of the task. 3) Note Safe Plan column, provide the corrective actions that will be taken to mitigate the hazards. 5) List tools needed to do the

Did conditions change? STOP the job! Identify control measures. Update the PTP. Communicate!