crane safety checklist
Crane Safety Checklist
| STEP(1): General Information | STEP(2): Time | |
|---|---|---|
| Crane Co: | Sub: | Start Date: |
| Crane Operator: | Project: | Comp.Date: |
| Lift Location: | Inspected by: | Time Start: |
| Foreman: | Cell #: | Time End: |
| EH&S Representative: | Cell #: | |
| Inspection Monitored by: | Project Manager: | |
| Qualified Rigger: Qualified Signal Person: | ||
| STEP(3): Ensure that the following items have been verified: | ||
| ☐ Current crane calibration certification with crane. Expiration date: | ||
| ☐ Current crane maintenance log and daily inspection log. | ||
| ☐ Current crane insurance certificate with crane. | ||
| ☐ Crane operator's license/certification. Expiration date: | ||
| ☐ General condition of crane/equipment. | ||
| ☐ Minimum of 25 feet of clearance for crane movement. | ||
| ☐ Verify tag lines are being used. | ||
| ☐ Inspect lifting devices (i.e., slings, shackles, eyebolts, etc.). | ||
| ☐ Review signals with operator. | ||
| ☐ Are power lines in area? Approximately how many feet? | ||
| ☐ Describe weather conditions: (i.e., clear, windy, raining, lightning, etc.) | ||
| STEP(4): Provide the following information: | ||
| 1. Describe the overhead work evacuation plan: | ||
| 2. Describe lift area barricading and how it will be patrolled: | ||
| 3. Describe communication and signaling methods with operator, personnel inside and outside (see STEP 6): | ||
| 4. Attach scale map(s) of the site and building showing crane placement, lift zone, and areas of swing radius, staging areas, barricading locations, etc. to be affected. | ||
| STEP(5): Prior to operating on the job site, a crane unit must meet the following standards: | |
|---|---|
| □ | Project managers must verify that crane and lifting companies have the proper insurance certificates filed with Therma prior to operation. |
| □ | Certification of the operator, rigger, and machine will be checked prior to operation. |
| □ | Cranes are inspected prior to the start of the day's work. |
| □ | All special operating rules particular to the site will be reviewed. |
| □ | The swing area and pickup/drop points will be marked off and a person assigned to keep unauthorized persons away from these areas. |
| □ | Any unauthorized person entering an exclusion zone will cause an end to the lift procedures until the person is removed. |
| □ | If the unit obstructs traffic on a public or private road or parking lot, a traffic attendant will be assigned with proper equipment (reflective vests, stop/go signs, etc.) |
| □ | All contractors at the site will be informed when a crane lift will occur, along with any special circumstances. |
| □ | Delivery to upper levels will be scheduled. Decision about where deliveries are made will be up to the prime contractor. |
| □ | Riggers will not remove cables to deliver material to upper floors. Only designated personnel from the prime contractor will be authorized to disconnect and reattach cables. |
| □ | Any crane operation in the vicinity of overhead power lines will be authorized by the prime contractor only. The site safety coordinator will stand by and watch line clearance. |
PRE-LIFT SAFETY MEETING
DATE:
| NAME | SIGNATURE |
|---|---|