crane safety checklist

Crane Safety Checklist

STEP(1): General Information STEP(2): Time
Crane Co: Sub: Start Date:
Crane Operator: Project: Comp.Date:
Lift Location: Inspected by: Time Start:
Foreman: Cell #: Time End:
EH&S Representative: Cell #:
Inspection Monitored by: Project Manager:
Qualified Rigger: Qualified Signal Person:
STEP(3): Ensure that the following items have been verified:
☐ Current crane calibration certification with crane. Expiration date:
☐ Current crane maintenance log and daily inspection log.
☐ Current crane insurance certificate with crane.
☐ Crane operator's license/certification. Expiration date:
☐ General condition of crane/equipment.
☐ Minimum of 25 feet of clearance for crane movement.
☐ Verify tag lines are being used.
☐ Inspect lifting devices (i.e., slings, shackles, eyebolts, etc.).
☐ Review signals with operator.
☐ Are power lines in area? Approximately how many feet?
☐ Describe weather conditions: (i.e., clear, windy, raining, lightning, etc.)
STEP(4): Provide the following information:
1. Describe the overhead work evacuation plan:
2. Describe lift area barricading and how it will be patrolled:
3. Describe communication and signaling methods with operator, personnel inside and outside (see STEP 6):
4. Attach scale map(s) of the site and building showing crane placement, lift zone, and areas of swing radius, staging areas, barricading locations, etc. to be affected.

STEP(5): Prior to operating on the job site, a crane unit must meet the following standards:
□ Project managers must verify that crane and lifting companies have the proper insurance certificates filed with Therma prior to operation.
□ Certification of the operator, rigger, and machine will be checked prior to operation.
□ Cranes are inspected prior to the start of the day's work.
□ All special operating rules particular to the site will be reviewed.
□ The swing area and pickup/drop points will be marked off and a person assigned to keep unauthorized persons away from these areas.
□ Any unauthorized person entering an exclusion zone will cause an end to the lift procedures until the person is removed.
□ If the unit obstructs traffic on a public or private road or parking lot, a traffic attendant will be assigned with proper equipment (reflective vests, stop/go signs, etc.)
□ All contractors at the site will be informed when a crane lift will occur, along with any special circumstances.
□ Delivery to upper levels will be scheduled. Decision about where deliveries are made will be up to the prime contractor.
□ Riggers will not remove cables to deliver material to upper floors. Only designated personnel from the prime contractor will be authorized to disconnect and reattach cables.
□ Any crane operation in the vicinity of overhead power lines will be authorized by the prime contractor only. The site safety coordinator will stand by and watch line clearance.

PRE-LIFT SAFETY MEETING

DATE:

NAME SIGNATURE