# START-UP SHEET VAV & CV Terminal Boxes

Job Name ____  
Job Number ____  
Job Address ____

## Section 5: Equipment Description

| Spec. #: |  | Submittal #: |  |  |  |  | P&ID / Dwg #: |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| Area Served: |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Step | Unit Tag # |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Step | Section 6: Pre-Installation Inspection |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 6.2 | Nameplate data matches vendor specifications. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 6.3 | All parts were received. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 6.4 | No visible signs of damage, leak, or defective parts. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 6.5 | Connections: size & location match specification. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 6.6 | Operational and Maintenance (O&M) manual is available in the field. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 6.7 | Start-up technicians have reviewed factory start-up procedures in O&M manual. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Performed By: Print Name ___ Initials ___ Date ___ |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Section 7: Installation Inspection |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.2 | Ceiling tile grid is labeled for unit location. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.3 | Unit is mounted right side up and parallel to air flow. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.4 | Unit tag # is attached to the unit. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.5 | Service clearance is adequate for maintenance. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.6 | Controls and actuator are installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.7 | Control linkage and setscrews are tight. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.8 | Hot and cold labels are attached in the correct place on the dual box. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.9 | Pneumatic connections are installed to the controller. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.10 | Hi and Lo test ports installed are capped. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.11 | Electrical connections are secure. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.12 | Ductwork and piping are connected correctly. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Performed By: Print Name ___ Initials ___ Date ___ |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Section 8: Operational Inspection |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 8.2 | Air leakage is acceptable. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 8.3 | Damper operates to full closed/full open position. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 8.4 | Damper operates to minimum position for reheat valve. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 8.5 | Controls operate actuator properly. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Performed By: Print Name ___ Initials ___ Date ___ |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Reviewed By: Print Name ___ Initials ___ Date ___ |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |