8 040 1 start up sheet vacuum pump

START-UP SHEET Vacuum Pump

Job Name ____ Job Number ____

Job Address ____

Section 5: Equipment Description

Spec. #: Submittal #: P&ID/Dwg #:
Area Served:
Data Design Actual On Site
Unit Tag #
Manufacturer
Model #
Serial #
Data Design Actual On Site
Motor Manufacturer
Model #
Serial #
RPM
Horsepower(HP)
Service Factor

Section 6: Equipment Pre-Installation Inspection

Step Inspection Description Yes No N/A Performed By(Initials & Date)
6.2 Nameplate data matches vendor specifications. □ □ □
6.3 All parts are received. □ □ □
Comments/ Observations

Performed By

(Therma)

Reviewed By

(Owner/Representatives)

Print Name Signature Date

Section 6: Equipment Pre-Installation Inspection Continued

Step Inspection Description Yes No N/A Performed By(Initials & Date)
6.4 No visible signs of damage, leak, or defective parts. □ □ □
6.5 Verify electrical service for correct voltage, current and thermal overload protection. □ □ □
6.6 Operational and Maintenance(O&M) manual is available in field. □ □ □
6.7 Start-up technicians have reviewed factory start-up procedures in O&M manual. □ □ □

Section 7: Installation Inspection

Step Inspection Description Yes No N/A Performed By (Initials & Date)
7.2 Unit is installed level. □ □ □
7.3 Tag # is attached to the unit. □ □ □
7.4 Unit base filled with concrete. □ □ □
7.5 Service clearance is adequate for maintenance. □ □ □
7.6 Spring isolators are installed and adjusted. □ □ □
7.7 Pressure gauge is installed per design. □ □ □
7.8 Inlet and outlet valves are installed properly. □ □ □
7.9 Exhaust devices are connected per design. □ □ □
7.10 Water piping is installed per manufacturer’s specification. (for wet sealed pumps) □ □ □
7.11 Pump is lubricated. □ □ □
7.12 Pump oil level is at manufacturer’s specification. □ □ □
7.13 Back pressure gauge is installed. □ □ □
7.14 Gas ballast valve is installed. □ □ □

Section 7: Installation Inspection Continued

Comments/ Observations

Performed By (Therma)

Reviewed By (Owner/Representatives)

Print Name Signature Date
7.15 Oil control is properly installed. □
7.16 Oil filter is installed. □
7.17 Oil drains are installed. □
7.18 Piping connections are tight. □
7.19 Clamps, bolts and setscrews are tight. □
7.20 Electrical connections are secure. □
7.21 Connection between the unit and piping are installed per good piping practices. □

Section 8: Operational Inspection

Step Inspection Description Yes No N/A Performed By(Initials & Date)
8.2 Unit vibration is acceptable. □ □ □
8.3 Pump rotation is correct. □ □ □
8.4 Coupling assemblies need alignment(If yes, proceed to step 5, otherwise go to step 6). □ □ □
8.5 Record final data:
Position Readings
Up/Down
Side/Side
Angular
8.6 Oil or water level is within manufacturer’s specifications. □ □ □
8.7 Oil or water temperature is within manufacturer’s specification. □ □ □

Section 8: Operational Inspection Continued

Comments/ Observations

Performed (Therma)

By

Reviewed By

(Owner/Representatives)

Print Name Signature Date
8.8 Record the operating parameters below:

Record Start Up Operating Parameters

Data Design Actual On Site
Unit Voltage
Current
Phase
Vacuum Pressure
Impeller diameter

END OF SECTION

Comments/ Observations


Performed By

Reviewed By

Print Name Signature Date

(Owner/Representatives)