Start up - Air Compressor

START-UP SHEET

Air Compressor

START-UP SHEET 1601 Las Plumas Ave.

Air Compressor Ph: (408) 347-3400

Job Name Job Number
Job Address

Section 5: Equipment Description

Spec. #: Submittal #: P&ID / Dwg #:
Area Served:
Air Compressor Data Design Actual On Site
Unit Tag #
Manufacturer
Model #
Serial #
Air Dryer Data Design Actual On Site
Unit Tag #
Manufacturer
Model #
Serial #
Belt Description
Size&Quantity

Section 6: Equipment Pre-Installation Inspection

Step Inspection Description Yes No N/A Performed By(Initials & Date)
6.2 Nameplate data matches vendor specifications. □ □ □

Comments/
Observations

Performed By

(Therma)

Reviewed By

Print Name Signature Date

(Owner/Representatives)


START-UP SHEET 1601 Las Plumas Ave.

Air Compressor Ph: (408) 347-3400

Step Inspection Description Yes No N/A Performed By(Initials & Date)
6.3 All parts are received. ☐ ☐ ☐
6.4 No visible signs of damage, leak, or defective parts. ☐ ☐ ☐
6.5 Verify electrical service for correct voltage, current and thermal overload protection. ☐ ☐ ☐
6.6 Operational and Maintenance(O&M) manual is available in field. ☐ ☐ ☐
6.7 Start-up technicians have reviewed factory start-up procedures in O&M manual. ☐ ☐ ☐

Section 7: Installation Inspection

ID Inspection Description Yes No N/A Performed By(Initials & Date)
7.2 Unit is installed level and is covered or out of weather. $\Box$ $\Box$ $\Box$
7.3 Tag # is attached to the unit. $\Box$ $\Box$ $\Box$
7.4 Service clearance is adequate for maintenance. $\Box$ $\Box$ $\Box$
7.5 Compressor pump is lubricated. $\Box$ $\Box$ $\Box$
7.6 Drive belt tension is correct. $\Box$ $\Box$ $\Box$
7.7 Pulleys are aligned and tight. $\Box$ $\Box$ $\Box$
7.8 Air inlet, oil filters,and discharge filters are installed properly. $\Box$ $\Box$ $\Box$
7.9 Compressor oil level is within manufacturer's specification. $\Box$ $\Box$ $\Box$
7.10 Guard is secure. $\Box$ $\Box$ $\Box$

Observations

(Owner/Representatives)

Print Name Signature Date

START-UP SHEET 1601 Las Plumas Ave.

Air Compressor Ph: (408) 347-3400

Step Inspection Description Yes No N/A Performed By(Initials & Date)
7.11 Auto drains are installed on tank and run to sanitary or condensate separator. $\Box$ $\Box$ $\Box$
7.12 All wiring connections are tight. $\Box$ $\Box$ $\Box$
7.13 Drain is piped properly. $\Box$ $\Box$ $\Box$
7.14 Air dryer is installed. $\Box$ $\Box$ $\Box$
7.15 Oil separator is installed. $\Box$ $\Box$ $\Box$
7.16 Oil separator drain is run to condensate management system. $\Box$ $\Box$ $\Box$
7.17 Condensate management system is installed for oil separation. $\Box$ $\Box$ $\Box$

Section 8: Operational Inspection

ID Inspection Description Yes No N/A Performed By(Initials & Date)
8.2 Unit vibration is acceptable. $\Box$ $\Box$ $\Box$
8.3 Motor rotation is correct. $\Box$ $\Box$ $\Box$
8.4 Air dryer is functional. $\Box$ $\Box$ $\Box$
8.5 Oil separator is functional. $\Box$ $\Box$ $\Box$
8.6 Record the operating parameters below:
Comments/ Observations

Performed By
(Therma)

(Owner/Representatives)

Reviewed By

Print Name Signature Date

START-UP SHEET

Air Compressor

START-UP SHEET 1601 Las Plumas Ave.

Air Compressor Ph: (408) 347-3400

Record Start Up Operating Parameters

Data Design Actual On Site
Unit Voltage
Current
Phase
Motor Rotation(RPM)
Horsepower(HP)
Air Dryer Voltage
Current
Phase
ΔT°F

End of Section

Comments/

Observations

Print Name Signature Date

(Owner/Representatives)