# START-UP SHEET Coils

Job Name ____

Job Number ____

Job Address

## Section 5: Equipment Description

| Spec. #: | Submittal #: | P&amp;ID/Dwg #: |
| --- | --- | --- |
| Area Served: |  |  |

| Step | Unit Tag # Section 6: Pre-Installation Inspection |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| 62 | Nameplate data matches vendor specifications. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 63 | All parts are received. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 64 | No visible signs of damage, leak, or defective parts. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 65 | Connections: size &amp; location match specification. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 66 | Operational and Maintenance (O&amp;M) manual is available in the field. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 67 | Start-up technician reviewed factory start-up procedures in the O&amp;M manual. |  |  |  |  |  |  |  |  |  |  |  |  |  |

Performed By: Print Name ____ Initials ____ Date ____

## Section 6: Installation Inspection

| 7.2 | Unit is properly installed per design. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| 7.3 | Tag # is attached to the unit. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.4 | Service clearance is adequate for maintenance. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.5 | Ductwork and flex connections are connected and sealed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.6 | Connection between the unit and piping are installed per good piping practices. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.7 | Isolation valves are installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.8 | In-line strainer is installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.9 | Coil drain valve is installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.10 | Condensate drain is trapped. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.11 | Pressure and temperature test ports are installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.12 | Air bleed devices are installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.13 | Control valve is installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.14 | Balancing devices are installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.15 | Pressure relief devices are installed. |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 7.16 | Electrical connections are secure. |  |  |  |  |  |  |  |  |  |  |  |  |  |

Performed By: Print Name ____  
Reviewed By: Print Name ____  
Initials _____  
Initials ____

Note: Use " $ \surd $ " = Yes, " X " = No or " 0 " = Not Applicable

Date _____

Date ____