8 036 1 start up sheet boiler

UP SHEET oiler

Job Name ____
Job Number ____
Job Address ____

Section 5: Equipment Description

Spec. #: Submittal #: P&ID/Dwg #:
Area Served:

Service Type: Hot Water $ \Box $ Steam $ \Box $ Other: $ \Box $ _____

Data Design Actual On Site
Unit Tag #
Manufacturer
Model #
Serial #

Section 6: Equipment Pre-Installation Inspection

Step Inspection Description Yes No N/A Performed By(Initials & Date)
6.2 Nameplate data matches vendor specifications $\Box$ $\Box$ $\Box$
6.3 All parts are received $\Box$ $\Box$ $\Box$
6.4 No visible signs of damage, leak, or defective parts $\Box$ $\Box$ $\Box$
6.5 Verify electrical service for correct voltage, current and thermal overload protection $\Box$ $\Box$ $\Box$
6.6 Operational and Maintenance(O&M) manual is available in field. $\Box$ $\Box$ $\Box$
6.7 Start-up technicians have reviewed factory start-up procedures in O&M manual. $\Box$ $\Box$ $\Box$

Comments/Observations

Performed By

(Therma)

Reviewed By

(Owner/Representatives)

Print Name Signature Date

START-UP SHEET Boiler

Section 7: Installation Inspection

Step Inspection Description Yes No N/A Performed By (Initials & Date)
7.2 Unit is installed in approved room and properly protected from weather and drafts. □ □ □
7.3 No negative pressure in the approved room. □ □ □
7.4 Proper air openings are provided. □ □ □
7.5 Unit is installed level on a concrete floor or non-combustible base. □ □ □
7.6 Tag # is attached to the unit. □ □ □
7.7 Service clearance is adequate for maintenance. □ □ □
7.8 Proper earth ground is connected to green ground screw in panel. □ □ □
7.9 Relief valve type, setting, and capacity are correct. □ □ □
7.10 Gas lines are bled of air. □ □ □
7.11 Draft hood or barometric damper is installed. □ □ □
7.12 Vent stack is proper height and size. □ □ □
7.13 Unrestricted vent cap on top to protect from weather and down drafts. □ □ □
7.14 Gas inlet piping is properly installed. □ □ □
7.15 Main and pilot gas valves are installed. □ □ □
7.16 Hot water supply outlet is proper size. □ □ □
7.17 Hot water return inlet is proper size. □ □ □
7.18 Make up water supply has proper shut-off and back flow device. □ □ □
7.19 Drain valve is installed. □ □ □
Print Name Signature Date
7.20 Temperature and pressure gauges are installed. □
7.21 High limit and operating controls are installed. □
7.22 Tube surfaces are inspected. □
7.23 Make-up water pressure regulator is installed. □
7.24 Expansion tank is installed. □
7.25 Pressure & temperature test ports are provided. □
7.26 Air separation device is properly installed. □
7.27 Pump(s) are installed. □
7.28 Pot feeder is installed. □
7.29 System has been cleaned and treated. □
7.30 Isolation valves are installed. □
7.31 Water treatment is installed. □
7.32 Steam check valves are installed. □
7.33 Steam traps are installed. □
7.34 Steam condensate is returned to steam make-up tank or sent to a tempering device before drain. □

Section 8: Operational Inspection

Step Inspection Description Yes No N/A Performed By(Initials & Date)
8.2 Unit vibration is acceptable. $\Box$ $\Box$ $\Box$
8.3 Heating components perform per manufacturer's specification. $\Box$ $\Box$ $\Box$
Comments/ Observations
Print Name Signature Date

START-UP SHEET Boiler

Step Inspection Description Yes No N/A Performed By(Initials & Date)
8.4 Natural gas supply pressure is at manufacturer's specification. □ □ □
8.5 Manifold pressure is at manufacturer's specification. □ □ □
8.6 Make sure thermostat is set. □ □ □
8.7 Record start up operating parameters in the Supplementary Forms(FN 8.028.2 or FN 8.028.3).

End of Section

Comments/ Observations

Comments/ ____


Performed By

(Therma)

Reviewed By

(Owner/Representatives)

Print Name Signature Date