Start up - Fan
START-UP SHEET Fan
START-UP SHEET 1601 Las Plumas Ave.
Fan Ph: (408) 347-3400
Job Name Job Number
Job Address
Section 5: Equipment Description
| Spec. #: | Submittal #: | P&ID / Dwg #: |
|---|---|---|
| Area Served: |
Service Type: Supply Return Exhaust Other:
| Data | Design | Actual On Site |
|---|---|---|
| Unit Tag # | ||
| Manufacturer | ||
| Model # | ||
| Serial # |
| Belt Description | |||
|---|---|---|---|
| Size&Quantity |
Section 6: Equipment Pre-Installation Inspection
| Step | Inspection Description | Yes | No | N/A | Performed By(Initials & Date) |
|---|---|---|---|---|---|
| 6.2 | Nameplate data matches vendor specifications. | □ | □ | □ | |
| 6.3 | All parts are received. | □ | □ | □ | |
| 6.4 | No visible signs of damage, leak, or defective parts. | □ | □ | □ | |
| 6.5 | Verify electrical service for correct voltage, current and thermal overload protection. | □ | □ | □ | |
| 6.6 | Operational and Maintenance(O&M) manual is available in the field. | □ | □ | □ |
Comments/
Observations
Performed By
(Therma)
Reviewed By
| Print Name | Signature | Date |
|---|---|---|
(Owner/Representatives)
START-UP SHEET Fan
START-UP SHEET 1601 Las Plumas Ave.
Fan Ph: (408) 347-3400
| Step | Inspection Description | Yes | No | N/A | Performed By(Initials & Date) |
|---|---|---|---|---|---|
| 6.7 | Start-up technicians have reviewed factory start-up procedures in the O&M manual. | □ | □ | □ | |
| 6.8 | If Therma provided a Variable Frequency Drive(VFD) that is controlling the fan, complete FN8.029.1 VFD start up form. |
Section 7: Installation Inspection
| Step | Inspection Description | Yes | No | N/A | Performed By(Initials & Date) |
|---|---|---|---|---|---|
| 7.2 | Unit is installed level. | $\Box$ | $\Box$ | $\Box$ | |
| 7.3 | Tag # is attached to the unit. | $\Box$ | $\Box$ | $\Box$ | |
| 7.4 | Service clearance is adequate for maintenance. | $\Box$ | $\Box$ | $\Box$ | |
| 7.5 | All access panels and covers are in place. | $\Box$ | $\Box$ | $\Box$ | |
| 7.6 | Vibration isolators are installed and adjusted. | $\Box$ | $\Box$ | $\Box$ | |
| 7.7 | Ductwork and flex connections are connected and sealed. | $\Box$ | $\Box$ | $\Box$ | |
| 7.8 | Fan drive belt tension is correct. | $\Box$ | $\Box$ | $\Box$ | |
| 7.9 | Sheaves are aligned. | $\Box$ | $\Box$ | $\Box$ | |
| 7.10 | Fan hub, sheaves and bearing setscrews are tight. | $\Box$ | $\Box$ | $\Box$ | |
| 7.11 | Motor and blower bearings are lubricated. | $\Box$ | $\Box$ | $\Box$ | |
| 7.12 | Electrical connections are secure. | $\Box$ | $\Box$ | $\Box$ | |
| 7.13 | Fan shaft bearings angular alignment is correct and bolts are tight. | $\Box$ | $\Box$ | $\Box$ | |
| 7.14 | Auxiliary drain pan is installed and its connections are piped. | $\Box$ | $\Box$ | $\Box$ |
Comments/
Observations
Performed By (Therma)
Reviewed By
(Owner/Representatives)
| Print Name | Signature | Date |
|---|---|---|
START-UP SHEET Fan
START-UP SHEET 1601 Las Plumas Ave.
Fan Ph: (408) 347-3400
Section 8: Operational Inspection
| Step | Inspection Description | Yes | No | N/A | Performed By(Initials & Date) |
|---|---|---|---|---|---|
| 8.2 | Unit vibration is acceptable. | $\Box$ | $\Box$ | $\Box$ | |
| 8.3 | Fan rotation is correct. | $\Box$ | $\Box$ | $\Box$ | |
| 8.4 | Supply, return or exhaust air dampers are functional. | $\Box$ | $\Box$ | $\Box$ | |
| 8.5 | Fire dampers are functional. | $\Box$ | $\Box$ | $\Box$ | |
| 8.6 | Supply, return and outside air dampers are functional. | $\Box$ | $\Box$ | $\Box$ | |
| 8.7 | Smoke detector is tested and is able to shut the unit down. | $\Box$ | $\Box$ | $\Box$ | |
| 8.8 | Make sure thermostat is set | $\Box$ | $\Box$ | $\Box$ | |
| 8.9 | Make sure time clock is set | $\Box$ | $\Box$ | $\Box$ | |
| 8.10 | Record start up operating parameters in the Supplementary Forms(FN 8.028.2 or FN 8.028.3). | $\Box$ | $\Box$ | $\Box$ |
Record Start Up Operating Parameters
| Data | Design | Actual On Site | ||
|---|---|---|---|---|
| Unit Voltage | ||||
| Current | ||||
| Phase |
End of Section
Comments/
Observations
| Print Name | Signature | Date | |
|---|---|---|---|
| Performed By (Therma) | |||
| Reviewed By (Owner/Representatives) |