| PRE-OPERATION CHECK |
|
|
|
|
|
|
| Date & Time |
|
|
|
|
|
|
| Job # |
|
|
|
|
|
|
| FAT Equip Tag(X-7701) |
|
|
|
|
|
|
| FAT Equip Specification ID# |
|
|
|
|
|
|
| P&ID Number |
|
|
|
|
|
|
| Job Specified Pressure(psig) |
|
|
|
|
|
|
| Job Specified H2O Quality(MΩ) |
|
|
|
|
|
|
| Lock-Out/Tag-Out Rev'd Therma |
|
|
|
|
|
|
| Lock-Out/Tag-Out Rev'd Owner |
|
|
|
|
|
|
| Operating Manual Rev'd Therma |
|
|
|
|
|
|
| Operating Manual Rev'd Owner |
|
|
|
|
|
|
| Visual Inspection for leaks/damage |
|
|
|
|
|
|
| Clearance from Combustibles |
|
|
|
|
|
|
| Verify Test vs. Relief Valve Press. |
|
|
|
|
|
|
| Verify HP Clamps&Gaskets |
|
|
|
|
|
|
| Verify Steam Flow Path w/P&ID |
|
|
|
|
|
|
| Verify Steam Duty Hose |
|
|
|
|
|
|
| Test Water Quality |
|
|
|
|
|
|
| Close Drain Valve |
|
|
|
|
|
|
| Make-up Water Pressure(psig) |
|
|
|
|
|
|
| PRESSURE CONTROLS, OPERATION AND TESTING |
|
|
|
|
|
|
| Open Make-up Water Supply |
|
|
|
|
|
|
| Switch power to ON |
|
|
|
|
|
|
| Verify Water Level Control |
|
|
|
|
|
|
| Verify Low Water Cutoff Control |
|
|
|
|
|
|
| Verify Operating Pressure Control |
|
|
|
|
|
|
| Verify High Limit Pressure Control |
|
|
|
|
|
|