6 006 1 cleaning flushing log

CLEANING AND FLUSHING LOG

Project: ____

Test No.: ____

Project No.: ____

Date of Test: ____

Brief Description of Test and Boundaries

Test Medium: Drawing / Spool #:
System: Line #:
Pipe Size(Inch): Minimum flowrate:
Equipment Included: Temporary equipment such as piping, hose, pumps, tanks, etc.

Has each system been completely pressure leak tested?

Yes No

Test Results

Start Time End Time Duration Time(*) Notes

Note: * If system is purged with nitrogen, air, etc. keep purging until attached to a clean white cloth at the end of test drop. If the system is cleaned & flushed with chemicals, the duration shall follow chemical vendor's recommendation.

DCR 05002

FN 6.006.1 (Rev. 0)