# Weld Program/Schedule Development Worksheet

MODEL 207

## MODEL 207

## CALCULATE THE FOLLOWING NUMBERS:

| Circumference: 314x tube OD C= |
| --- |
| RPM=IPM*/C RPM= |
| IPM(inches per minute)4-7 for SST |
| Time for 1 revolution=60/RPM Time= |
| Tie In= |
| Rotation Delay= |
| Total Time=Rot. Delay+ Tie in+Revol.Time Total Time= |
| Level Time=Total Time/Number of Levels Level Time= |

Notes:

- High Current Amps - 1 amp per .001 wall thickness

- Low Current Amps = 1/3 of High Amps

Weld Head Model: _____

- Pulse Times Sec. = Between 01 - 30

Joint Desc :____

Arc Gap:____

Tungsten Length:____

Arc Gas: ____ Dia: ____

Backup Gas: _____ SCFH: _____

Prepared by:____

Approved by:____

## WELD SCHEDULE FILL IN:

| OD | WALL | TYPE | MATERIAL | QTY |
| --- | --- | --- | --- | --- |
| PRE | POST | UP SLOPE | DOWN | ROT |
| LEVEL 1 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |
| LEVEL 2 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |
| LEVEL 3 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |
| LEVEL 4 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |
| LEVEL 5 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |
| LEVEL 6 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |
| LEVEL 7 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |
| LEVEL 8 |  |  |  |  |
| PULSE | ROT | PR1RPM | BACK |  |
| TIME | PRIAMP | BACK | PR1PULSE | BACK |